BPCS/LX Tip of the Week: Shop Order Status Codes

Shop Order status codes have been improved to provide a more comprehensive view of the life cycle of a shop order.

In addition to the previously existing ‘Shop Order Status Code’, the Production Status Code has been added. This code is designed to indicate progress and completion levels of each shop order.  Valid codes are:

‘blank’ - no completed items

25 - a partial quantity has been reported

35 - the quantity reported is equal to or greater than the order quantity

 

Optimize Your Manufacturing Today!

Previous Article BPCS/LX Tip of the Week: Notes Maintenance Enhancements
Next Article Baan/LN Tip of the Week: Operational Inefficiencies
Print
32136 Rate this article:
3.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

You can change your master schedule by specifying the type of master schedule update to perform. You can run a Net Change or Regenerative Schedule.

You also have the ability to clear the lower level requirements out of the Planned and Firm-Planned Order file.

In LX, the actual costs that can be set up fall into three categories: Material, Labor, and Overhead. If your LX database is set up properly with the LX cost accounting, you should be able to identify:

  • How much the item should cost
  • How to track the cost of work underway
  • How much the item actually did cost
  • Why the job cost varied from the expected cost
     

Capturing the data to track activity with associated costs can be time-consuming. With an MES solution, the information you need for costing is tracked instantly.