BPCS/LX Tip of the Week: Gain Efficiency & Save Money – Evaluate Your Production Lines

When is the last time you took a hard look at your production lines?
 
  • How are we moving product through our facility?
  • Do we have work instructions / drawings available where needed?
  • Do we have frequently used inventory available at the line?
  •  
  • Where are the bottlenecks?
  • Are processes automated, where possible?
 
Taking a hard look at your processes and procedures may reveal some interesting results.

Don’t assume that everyone is doing things the same way. Some may be superstars, and others may need some mentoring. Some processes may be outdated and costing you time and money, while others are extremely efficient. One area of the business may benefit from how others operate. Take the time to review and analyze your findings. Your company may benefit greatly as a result.


Optimize Your Manufacturing Today!

Previous Article Baan/LN Tip of the Week: Gain Efficiency & Save Money – Evaluate Your Production Lines
Next Article BPCS/LX Tip of the Week: The 3 Secrets to Improving Your MO (Manufacturing Optimization)
Print
35719 Rate this article:
No rating
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

You can change your master schedule by specifying the type of master schedule update to perform. You can run a Net Change or Regenerative Schedule.

You also have the ability to clear the lower level requirements out of the Planned and Firm-Planned Order file.

In LX, the actual costs that can be set up fall into three categories: Material, Labor, and Overhead. If your LX database is set up properly with the LX cost accounting, you should be able to identify:

  • How much the item should cost
  • How to track the cost of work underway
  • How much the item actually did cost
  • Why the job cost varied from the expected cost
     

Capturing the data to track activity with associated costs can be time-consuming. With an MES solution, the information you need for costing is tracked instantly.