George Moroses

Infor LX & BPCS Tip of the Week: Installing WebTop Over LX

If you plan to use Infor WebTop, the WebTop version 4.7 or above is required when running LX 8.4. Also, acquire and install the latest WebTop 4.7 patches from Infor Xtreme prior to running LX WebTop. WebTop 4.7 can be applied to your existing environments before you install 8.4.0. If this is completed before installing LX 8.4 then the LX install will take care of much of the Webtop server configuration automatically, including installing the LX Webtop metadata, updating WEB_ENV, and including the Webtop Platform library in the INLIBL data area as part of the environment setup. If you choose to install WebTop after the LX 8.4 installation is completed, the “Infor LX 8.4 Webtop 4.7 Configuration Guide” will guide you through all the configuration steps to set up Webtop for your LX environment.

Previous Article LN & Baan Data Collection News – A BUSY 2nd Quarter for Crossroads RMC Data Collection!
Next Article Infor LN & Baan Tip of the Week: What is Included with Infor Operating Service (Infor OS)?
Print
34440 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

You can change your master schedule by specifying the type of master schedule update to perform. You can run a Net Change or Regenerative Schedule.

You also have the ability to clear the lower level requirements out of the Planned and Firm-Planned Order file.

In LX, the actual costs that can be set up fall into three categories: Material, Labor, and Overhead. If your LX database is set up properly with the LX cost accounting, you should be able to identify:

  • How much the item should cost
  • How to track the cost of work underway
  • How much the item actually did cost
  • Why the job cost varied from the expected cost
     

Capturing the data to track activity with associated costs can be time-consuming. With an MES solution, the information you need for costing is tracked instantly.