Infor LN & Baan Tip: Serialized Controlled Item >> to >> Non-Serialized Controlled item

Changing an item from serialized to not serialized can only be done by unchecking the Serialized flag in session Item - General (tcibd0101s000). 
The conditions for this are:

  • On Hand inventory is 0.00
  • On Order inventory is 0.00
  • Allocated inventory is 0.00

There are no records in the Inventory Transactions by item (whinr1510m000). Instead of removing all allocations and inventory, a new item may be created to replace the serialized item via the session Alternative Items (tcibd0505m000). Alternatively, the item can be converted from serialized in inventory to serialized not in inventory. 

In Item – Warehousing (whwmd4500m000) all the serial registration flags can be set to “No” and a Lot and Serial Registration Template (whwmd4102m000) can be linked in which all registration is explicitly excluded. In this way, although still serialized, the item is not subject to any serial registration and acts like a not serialized item.

Contact us today to learn more. 800.762.2077  | solutions@crossroadsrmc.com

Previous Article Infor LX & BPCS Tip: Support for IBM i 7.3 and Infor LX Products
Next Article Is it time to get more out of your ERP?
Print
56848 Rate this article:
5.0

Contact

Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Tips: LN | Baan

Companies can decide to involve a subcontractor and subcontract part of their activities. The subcontractor carries out the work and returns the products to your company.

In Infor LN, subcontracting is considered as purchasing labor from a third party. Therefore, if a manufacturer wants to subcontract work, he must generate a purchase order to start the subcontracting process. These are the types of subcontracting:

  • Subcontracting with material flow
    • Operation subcontracting: For operation subcontracting, a part of the production process (one or more operations) is subcontracted.
    • Item subcontracting: For item subcontracting, an item's entire production process is subcontracted. Therefore, it is always used with material flow support.
  • Subcontracting without material flow: The simplest form of subcontracting is to generate a subcontracting purchase order to record the operations outsourced to a subcontractor. The subcontracting purchase order only represents the administrative handling of the subcontracting process. When the subcontracted item is received back from the subcontractor, you must close the subcontracting purchase order, which initiates the production process.
  • Unplanned subcontracting: Unplanned subcontracting is applicable when you subcontract after generating a production order. For unplanned subcontracting, a purchase order is generated from the production order and the material supply lines are populated by Shop Floor Control.
  • Service subcontracting: For service subcontracting, work on an item to be maintained or repaired is subcontracted. This work entails the entire repair process, or only a part of it. Service subcontracting can be used with or without material flow support.

To start the subcontracting process, a purchase order is required.