Infor LX & BPCS Tip of the Week: Fast Line Entry

George Moroses 2 34881 Article rating: 5.0

LX Order Entry has been enhanced to provide a new Fast Line Entry panel. The new presentation makes traditional order entry faster by reducing the keystrokes necessary to create new lines. It also places the item description on the primary entry line, making it easier to confirm that the desired item has been ordered as each line is validated.

Impact:

ORD700DA – Fast Line Entry
ORD700D2 – Order Line Entry, Quote Line Entry and RMA Line Entry

Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant

Crossroads RMC 1 55905 Article rating: 5.0

No matter how large or small your manufacturing plant is, efficiency and productivity relative to your capital investment are the keys to maintaining your competitive edge. Wasting time and money is not something anyone wants to do, but manufacturers need to be especially mindful of both and actively work to address any issues that lead to productivity or financial loss.

Source: https://www.onupkeep.com/blog/improve-production-efficiency/

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

Kathy Barthelt 0 45164 Article rating: 5.0

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Infor LX & BPCS Tip of the Week: Multi-Level Backflush (LX 8.4)

George Moroses 0 36143 Article rating: 5.0

Clients who want to process more than one customer order line, one item, or one shop order are now able to continue processing without having to leave the Multi-Level Backflush screen. After entering data for a specific category, users are now able to use the F18=Accept & Continue function key that allows users to start and complete an action and remain on the MultiLevel Backflush screen, LMP600D1, to perform the next action. Previously, users were sent back out to the SYS500-06 screen after processing using single customer order line, shop order, or item.

This enhancement includes these programs or areas:

  • Lean Production Back-flush Selection Panel, LMP600D  
  • Lean Production Back-flush Selection Panel, LMP600FM
  • Lean Production Back-flush Selection Panel, LMP600HT