Baan/LN Tip of the Day: Virtualization

Kathy Barthelt 0 48887 Article rating: No rating

The advantages of virtualization include the following:
 

• You get more out of your existing resources. Pool common infrastructure resources and break the legacy “one application to one server” model with server consolidation.

• You can reduce datacenter costs by reducing your physical infrastructure and improving your server to admin ratio. Fewer servers and related IT hardware means reduced real estate and reduced power and cooling requirements. With better management tools, you can improve your server to admin ratio so personnel requirements are reduced.

• You can increase the availability of hardware and applications for improved business continuity.

• Securely back up and migrate entire virtual environments with no service interruptions. Eliminate planned downtime and recover immediately from unplanned issues.

• Gain operational flexibility. Respond to market changes with dynamic resource management, faster server provisioning, and improved application deployment.

 

The disadvantages of virtualization include the following:

 Virtualization adds overhead to the CPU, memory, IO, and network.

 Virtualization adds an additional layer to the hardware and software stack. Therefore, additional complexity is introduced in the following circumstances:

CST Industries Goes Live With LN Ecommerce Site for Dealers

Crossroads RMC 0 30435 Article rating: No rating

Crossroads RMC has partnered with Xenitel Managed Service Solutions and CST Industries to create an online parts ordering site for CST’s dealers. The site is live as of June, 2015. This site was developed largely to simplify the ordering process for CST’s dealers, providing information on available inventory, flexible ordering, fast shipments, and improved dealer support.

 

CST is a global leader in the manufacture and construction of factory coated metal storage tanks, aluminum domes and specialty covers.

Baan/LN Tip of the Day: First Free Numbers

Kathy Barthelt 0 316 Article rating: No rating

In Baan IV, users define series and numbers in the Maintain First Free Numbers (tcmcs0147m000) session. In the Type of Number field, users must select the type of documents for which the series will be used. The generated document numbers are always numeric and can consist of up to six characters.

 

In LN, users must define number groups in the Number Groups (tcmcs0151m000) session and then in the First Free Numbers (tcmcs0150m000) session, define the series and numbers of each number group. Users assign the number groups to various purposes in the corresponding sessions. For example, in the Sales Order Parameters (tdsls0100s400) session, users can select the number group for sales orders and sales schedules. In the Sales Offices (tdsls0512m000) session, users can then select a series of that number group for the sales orders generated by a specific sales office. As the series codes can be alphanumeric, the generated document numbers can be alphanumeric and they can consist of up to nine characters.

BPCS/LX Tip of the Day: Material Requirement Dates and Lead Time Offsets in MRP

Anthony Etzel 0 343 Article rating: No rating

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-work days in the shop calendar.

 

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.