Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News, Crossroads Connection

BPCS/LX Tip of the Week: Additional Electronic Signature Controls

Anthony Etzel 0 31235 Article rating: No rating

Electronic Signature Controls have been expanded to include additional programs, files and fields.  

When manufacturing work centers are updated through Work Center Maintenance (CAP100), the system can now require Electronic Signature processing to complete the process. This enhancement allows for broader Electronic Signature controls.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Problems With Staying on an Old Porting Set

Kathy Barthelt 0 55982 Article rating: No rating

Here are some issues that you might run into if you stay on an old porting set too long:

  • Incompatibility because of operating system patches
  • Printing issues because of out-of-date libraries
  • Potential performance issues if binaries are not updated
  • Updating third party products may not be possible because of dependencies
  • Limited support from Infor
  • Issues with updating database software/patches because of dependencies (if database is also running on same server as application)

Need help getting on a newer porting set? We'd be happy to help.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Facility Security Ranges

Anthony Etzel 0 30949 Article rating: No rating

Previously, a user was able to complete the Cost Transfer (CST920) process for any range of facilities regardless of their security settings established in SYS600.

This enhancement verifies the user security settings that were set up in SYS600 before processing cost transfers for a range of facilities in CST920. If the user has authority for a facility range, but there are facilities within that range that are not authorized, the program skips those facilities and complete the cost transfer process. This enhancement provides security in CST920 that prevents incorrect cost transfers from being processed.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Inventory Transaction Post to G/L by Cost Type

Anthony Etzel 0 29385 Article rating: No rating

This enhancement provides a method to post material, labor and overhead values on inventory postings to the general ledger to meet financial reporting requirements. The solution provides an optional further breakdown of cost by cost bucket using the new G/L Cost Type.

The benefit this program provides is the ability to post detailed material, labor, and overhead values during inventory posting to the general ledger to meet financial reporting requirements. It also helps isolate import and transport cost elements required by some countries. Global companies with intercompany purchasing are able to isolate material costs so that it is eliminated at a consolidated level.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Inventory Tracking

Kathy Barthelt 0 58849 Article rating: No rating

Do you have a good handle on your inventory? Do you know when products need to be reordered and which are on their way? Are you able to find inventory easily within your facility, or are items getting misplaced and then unnecessarily reordered? Having a good inventory system in place will avoid unnecessary costs and save lots of time. We’ve been helping customers with this for over 20 years. Let us know if you need help getting started.

Optimize Your Manufacturing Today!

RSS
First126127128129131133134135Last