17Jul2025 Infor LX/BPCS Tips & Tricks for TECHNOLOGY: New Features in 8.4.2 Thursday, July 17, 2025 Read more New IDF Inquiries Infor LX has a long history of providing IDF inquiries over most critical business areas, but there are still some areas that lack this capability. The following IDF inquiries are now available in 8.4.2: Customer Quote Customer Quote Line RMA (Return Material Authorization) RMA Line Benefits Ability to sort, subset, filter, and view information in a modern and intuitive way Point and click navigation to related information – 360 views Exceptional personalization and extensibility capabilities Read more
17Jul2025 Infor LX/BPCS Tips & Tricks for OPERATIONS: New IDF Inquiries Thursday, July 17, 2025 Read more New IDF Inquiries Infor LX has a long history of providing IDF inquiries over most critical business areas, but there are still some areas that lack this capability. The following IDF inquiries are now available in 8.4.2: Customer Quote Customer Quote Line RMA (Return Material Authorization) RMA Line Benefits Ability to sort, subset, filter, and view information in a modern and intuitive way Point and click navigation to related information – 360 views Exceptional personalization and extensibility capabilities Read more
22Sep2015 Baan/LN Tip of the Week: Data Sizing Moving to LN Tuesday, September 22, 2015 Read more The Infor LN database must be created with the appropriate size. For example, if at least 150 GB is required for a year, create the database with the required size from the beginning. Do not let the size increase to the required size and cause additional fragmentation in the database and the NTFS volume. Set the autogrowth to a minimum of 10 percent or 1 GB (for each extent) to avoid fragmentation on file system level. Never use the default extent size of 1 MB. Read more
15Sep2015 Baan/LN Tip of the Week: SIC Planning for MRP/MPS Planned Items Tuesday, September 15, 2015 Read more If you have a parts warehouse and prefer to use SIC for planning (re-order point) but need to use MRP/MPS planning for production, create a non-nettable warehouse for the parts warehouse and run the SIC plan against that warehouse. When running the SIC plan, be sure to set the Order System to “MPS to MRP” for Baan IV and to “Planned to Planned” for Baan V and LN. Using this method you keep the parts inventory out of the production planning and in the hands of the parts warehouse planner. Read more