18May2015 BPCS/LX Tip of the Day: MRP/MPS Simulation Monday, May 18, 2015 Read more The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule. Read more
12May2015 BPCS/LX Tip of the Day: Inventory Stocking Levels – LX Tuesday, May 12, 2015 Read more The system supports four levels of inventory. You can view summaries of stock at each level through the Material Status Inquiry program or through reports. Below are the four levels: ▪ Item ▪ Item + warehouse ▪ Item + warehouse + location ▪ Item + warehouse + location + lot The lot number level and/or container of inventory can cross multiple warehouses and locations. For example, item + lot or item + lot + container. Locations exist within warehouses. There is no limit on the number of warehouses, locations, or lots that you can assign to an item. Read more
17Jul2025 Infor LN & Baan Tips & Tricks for FINANCE: Moving calendar periods Thursday, July 17, 2025 Read more You can move monthly periods to a different parent period. For example, if you have a monthly calendar, you can create quarter periods and move months to the quarters. Select Financials > Global Ledger > Setup > Finance Enterprise Group > Maintenance. Open the finance enterprise group. Click the Calendar tab. Open the calendar for which you want to move periods. Click the Hierarchy tab. Select the periods to move. Select Actions > Move. Select the new parent period under which you want to move the periods. Click OK. Read more
17Jul2025 Infor LN & Baan Tips & Tricks for OPERATIONS: Revisions and approval Thursday, July 17, 2025 Read more Note that the Bill of Material and Routing are revision controlled. When a structure is generated for the first time, a first revision is made with status New. If the Approve Structures Automatically check box is selected in the Job Shop Master Data Parameter (tirou0500m000) session, the revision is created with status Approved. If the structure is regenerated, the current revision status determines the result: If the status is New, this revision is overwritten If the status is Approved, a new revision is created Read more