16Mar2016 BPCS/LX Tip of the Week: Changing the Master Schedule Wednesday, March 16, 2016 Read more You can change your master schedule by specifying the type of master schedule update to perform. You can run a Net Change or Regenerative Schedule. You also have the ability to clear the lower level requirements out of the Planned and Firm-Planned Order file. Read more
1Mar2016 BPCS/LX Tip of the Week: Actual Costs for Manufactured Items Tuesday, March 1, 2016 Read more In LX, the actual costs that can be set up fall into three categories: Material, Labor, and Overhead. If your LX database is set up properly with the LX cost accounting, you should be able to identify: How much the item should cost How to track the cost of work underway How much the item actually did cost Why the job cost varied from the expected cost Capturing the data to track activity with associated costs can be time-consuming. With an MES solution, the information you need for costing is tracked instantly. Read more
17Jul2025 Infor LN & Baan Tips & Tricks for FINANCE: Moving calendar periods Thursday, July 17, 2025 Read more You can move monthly periods to a different parent period. For example, if you have a monthly calendar, you can create quarter periods and move months to the quarters. Select Financials > Global Ledger > Setup > Finance Enterprise Group > Maintenance. Open the finance enterprise group. Click the Calendar tab. Open the calendar for which you want to move periods. Click the Hierarchy tab. Select the periods to move. Select Actions > Move. Select the new parent period under which you want to move the periods. Click OK. Read more
17Jul2025 Infor LN & Baan Tips & Tricks for OPERATIONS: Revisions and approval Thursday, July 17, 2025 Read more Note that the Bill of Material and Routing are revision controlled. When a structure is generated for the first time, a first revision is made with status New. If the Approve Structures Automatically check box is selected in the Job Shop Master Data Parameter (tirou0500m000) session, the revision is created with status Approved. If the structure is regenerated, the current revision status determines the result: If the status is New, this revision is overwritten If the status is Approved, a new revision is created Read more