• Visit Us on Facebook
  • Visit Us on Twitter
  • Link with Us on LinkedIn
800.762.2077

Infor LN & Baan Tip of the Week: Quantity change during shipment planning – 10.7

Customers who use the Projected Shipments concept, and with that the Shipment Planning Workbench, require more flexibility in modifying outbound order lines before projected shipments are generated. The most important requirement is the option to change item quantities, which is a typical instrument to react on specific circumstances such as truck size and inventory situation. A Shipment Planning tab has been added to the Outbound Order Lines to enable users to perform shipment planning activities in terms of quantities and dates.

Tuesday, August 20, 2019/Author: Kathy Barthelt/Number of views (2924)/Comments (0)/ Article rating: 5.0
Tags:

Infor LX & BPCS Tip of the Week: 6 Powerful Steps to Win with Automation

  1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.     
  2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.
  3. Easy electronic scheduling by sequence and changing job priorities.
  4. Evaluate differences using actual times compared to standards.
  5. Improve data accuracy and eliminate the need to chase and fix errors.
  6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Optimize Your Manufacturing Today!

Tuesday, August 20, 2019/Author: Anthony Etzel/Number of views (1896)/Comments (0)/ Article rating: 5.0
Tags:

Infor LN & Baan Tip of the Week: The RFQ Comparison Workbench in LN 10.7

The RFQ Comparison Workbench (tdpur8366m000) session has been introduced to compare bidder responses and select the best deal from the existing combinations. The bidder combinations are displayed based on the total amounts or the criteria set defined on the selected request for quotation (RFQ). Users can use the session to:

• Filter the best response from the suppliers or bidders

• Determine the best responses based on Total Amount

• Determine the best responses based on Criteria Set

This session can be started from a specific RFQ or from the RFQ tab in the RFQ (tdpur8310m000) session. Initially, the session is not available on the menu, but users can add it to the menu.

Tuesday, August 06, 2019/Author: Kathy Barthelt/Number of views (2900)/Comments (0)/ Article rating: 5.0
Tags:

Infor LX / BPCS Tip of the Week: Pre-assigned lot numbers for multi-level SO release

In addition to assigning lot numbers in Shop Order Entry/Maintenance (SFC500) after the shop orders have been released, users can now pre-assign lot numbers during the Multi-level Shop Order Release process (SFC530) and the Multi-Level Back-flush process (LMP600) for sub-assemblies that are lot controlled items. The user has the choice of using the parent lot ID, using the next sequential generated lot ID, or not pre-assigning lot IDs. Multiple items per lot must be installed to use the parent lot number option.

Tuesday, August 06, 2019/Author: Anthony Etzel/Number of views (2115)/Comments (0)/ Article rating: 5.0
Tags:
RSS