Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant

Crossroads RMC 0 74288 Article rating: 5.0

No matter how large or small your manufacturing plant is, efficiency and productivity relative to your capital investment are the keys to maintaining your competitive edge. Wasting time and money is not something anyone wants to do, but manufacturers need to be especially mindful of both and actively work to address any issues that lead to productivity or financial loss.

Source: https://www.onupkeep.com/blog/improve-production-efficiency/

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

Kathy Barthelt 0 103727 Article rating: 5.0

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Infor LX & BPCS Tip of the Week: Multi-Level Backflush (LX 8.4)

George Moroses 0 51137 Article rating: 5.0

Clients who want to process more than one customer order line, one item, or one shop order are now able to continue processing without having to leave the Multi-Level Backflush screen. After entering data for a specific category, users are now able to use the F18=Accept & Continue function key that allows users to start and complete an action and remain on the MultiLevel Backflush screen, LMP600D1, to perform the next action. Previously, users were sent back out to the SYS500-06 screen after processing using single customer order line, shop order, or item.

This enhancement includes these programs or areas:

  • Lean Production Back-flush Selection Panel, LMP600D  
  • Lean Production Back-flush Selection Panel, LMP600FM
  • Lean Production Back-flush Selection Panel, LMP600HT

Infor LX & BPCS Tip of the Week: Journal Upload – EGLi

George Moroses 0 53697 Article rating: 5.0

EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

Infor LN & Baan Tip: Open Transactions Check – LN 10.7

Kathy Barthelt 0 100571 Article rating: 5.0

When closing a project, users were informed about open transactions blocking the closure process. To proactively check on open transactions, the Show Open Transactions option has been introduced in the Project Status (tppdm6107s000) session. With this option, issues can be resolved before changing the status.

Infor's Support Schedule for Infor LN & Baan

How Crossroads RMC can help

Kathy Barthelt 0 79060 Article rating: 5.0

Infor recently announced their support schedule for all versions of Infor LN & Baan.

Not sure what your company’s strategy should be moving forward?

Let us help you figure out the best path forward for YOUR company. Our goal is to put you on a path that ensures that you are supported and that your needs are met today and in the future without breaking the bank. Visit our Services page to learn more>

12345

Tips:  LX | BPCS | M3

Tips: LN | Baan

You use LN audit features to fully or partially log changes that users make to the LN database tables when they use LN sessions.

The audit functionality is based on the concept of audit profiles. In an audit profile, you define which tables and fields are audited and when, in the context of an audit profile. To bundle profiles in the same functional area, you can relate the profiles to audit categories. You can export and import audit profiles with various options to enable a quick configuration. The audit trail is stored in sequence files, which are generated for each combination of company and table.

Note: For some important parameter tables it is required that auditing is enabled.

You can view or print the history of modifications.