Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 39700 Article rating: No rating
For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

BPCS/LX Tip of the Week: The Item Master Requirements Code

Anthony Etzel 0 35273 Article rating: No rating

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

BPCS/LX Tip of the Week: How To Capture Re-Work Time (Part 1)

Anthony Etzel 0 41446 Article rating: No rating
In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.

BPCS/LX Tip of the Week: Configuration Management

Anthony Etzel 0 42631 Article rating: No rating

Make to Order? No problem if you use the Configuration Management System. This LX product allows you to define and configure a make to order product during Customer Order Entry. Basically, you have the option to create different products under the same common product item. You will get two completely different common end items that are configured from the same common parent.

The customer orders are planned and turned into shop orders for each end item with all the associated components. With an MES solution in place, the shop order side is easy to schedule and allows you to manage the shop floor.

BPCS/LX Tip of the Week: Uses for LX Bill of Material

Anthony Etzel 0 47858 Article rating: No rating
In Infor LX, based on how your items are set up and on how you structure the Bill of Material, the following are some usages of a bill of material by functioning area:

  • Engineering & QA – change control, product design and specifications
  • Manufacturing – build instructions , material pick lists
  • Accounting – product costing
  • Materials Inventory – material and inventory planning
  • Sales – customer order processing
  • Production Scheduling – item scheduling (also a component of an MES solution)

BPCS/LX Tip of the Week: Indirect Labor Reporting

Anthony Etzel 0 45402 Article rating: No rating
In the Shop Floor Control Module, you have the ability to key in both direct labor and indirect labor. However you want to establish specific types (reasons) for the indirect labor. The SFC600 labor entry program shows a reason code field, but it is designed for reject quantity and machine downtime reasons, not indirect labor reasons.

There is a way around this. With an MES solution you have the ability to setup and report indirect time against a specific reason code.

BPCS/LX Tip of the Week: Shop Order Status

Anthony Etzel 0 46865 Article rating: No rating

You can see the status of the Shop Order when using SFC300 Shop Order Inquiry. You want to be sure that your shop orders are at the correct status in order to report against them.

The following are the shop order status codes:

04 = The Shop order has been entered.

05 = The Shop order has been released and printed.

14 = The Shop order has been released, but not printed. If a shop order is at this status, you have released it and it is not printed due to a system failure, or the order has been put on hold.

XX = The Shop order is closed.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 45688 Article rating: No rating
For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.
RSS
First2829303132333537

Theme picker

Tips:  LX | BPCS | M3

Advanced Remittance Processing, ARP, provides an automated approach to your cash application process. ARP works together with Accounts Receivable to save valuable time and resources by automatically applying incoming payments to open receivables during daily batch processing. You can easily and efficiently resolve unapplied remittances online.

Advanced Remittance Processing (ARP) is an automatic cash application process that allows you to perform the following functions:

In the ever-evolving landscape of manufacturing, cyber threats have become a formidable challenge, with a notable spike in ransomware attacks catching many off guard. These sophisticated attacks deploy tactics that are often new and bewildering to manufacturers, pushing the boundaries of what we thought we knew about cybersecurity in the industry. Let's dive into how these advanced threats are reshaping our approach to digital defense in manufacturing.

https://www.industryweek.com/technology-and-iiot/cybersecurity/article/21284176/a-new-wave-of-cyber-attacks-five-actions-to-take-now

12345678910Last

Theme picker

Tips: LN | Baan

Many transactions in all kinds of modules use order numbers or serial numbers. These order numbers are most often automatically generated. In the Number Groups (tcmcs0151m000) session you can define groups of order numbers used for dedicated areas. A Number Group is a group of the first free number series that you can assign to a specific use. All the numbers that Infor LN generates in the number groups that are dedicated to the same purpose are unique.

All the first free numbers are stored in the table tcmcs050.

As many different processes can request a free number from the number groups, we often see delays in the performance, due to locking on the first free number records. This locking issue can have a severe impact on the performance of huge batch-type transactions, but also on the performance perceived by individual users in many areas in LN.

For example:

In the ever-evolving landscape of manufacturing, cyber threats have become a formidable challenge, with a notable spike in ransomware attacks catching many off guard. These sophisticated attacks deploy tactics that are often new and bewildering to manufacturers, pushing the boundaries of what we thought we knew about cybersecurity in the industry. Let's dive into how these advanced threats are reshaping our approach to digital defense in manufacturing.

https://www.industryweek.com/technology-and-iiot/cybersecurity/article/21284176/a-new-wave-of-cyber-attacks-five-actions-to-take-now

12345678910Last

Theme picker

Categories