Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Introducing VJES (Visual Job Execution Software)

Kathy Barthelt 0 1283 Article rating: 5.0

You would be hard-pressed to completely miss the stories in the news recently about quality issues in manufacturing. The crux of the issue has been a complete focus on production and a lack of focus on quality. Yes, it is a wonderful thing to get the goods out the door, but when you’re sacrificing quality, what good is it really?

There are specifications for production for a reason. Engineering exists for a reason. If products are not built according to exact design specifications, scrap is likely to go up, rework goes up, customer returns and/or service requests go up, and customer satisfaction and overall customer confidence in your product plummets.

Is all of that worth it to get the good out the door in the shortest amount of time possible?

Every manufacturer relies on a few core measurements to manage their operations. Measurements like efficiency, productivity, capacity, labor and equipment utilization are used by manufacturers across the globe to benchmark performance and assess the effectiveness of processes.

Quality needs to be part of that mix. Because measurements like efficiency and productivity don’t necessarily mean high quality, incorporating ways to ensure quality from the start can help to eliminate waste and rework.

Manufacturing quality is achieved through quality control using documented, repeatable, and measurable processes.

What if you could incorporate quality control in every operation, at every work center to not only ensure high-quality finished goods but also simultaneously train high-quality operators?

Introducing Crossroads’ ERP independent solution, VJES (Visual Job Execution Software)...

Top 10 Things (you might not know) About Crossroads RMC

Crossroads RMC 0 5701 Article rating: 5.0


10.  Crossroads RMC has been in business since 1984 & has been an  partner since 1991
 

 9. Crossroads RMC offers functional & technical training on all versions of Infor LX, BPCS, Infor LN, and Baan and will completely tailor the training to your specific needs. 🤝🏽

 8.  Our consultants have over 1,000 years of combined experience working with manufacturers just like you! 🤓

 7.

 6.

 5.

 4.

 3.

 2.

 1.

Analytics Dashboard Pre-configured views for Infor LX | BPCS | Infor LN | Baan | Infor M3

ERP Reports: Get EXACTLY what you need when you need it for as little as $125/user/month

Crossroads RMC 0 21800 Article rating: 5.0

Everyone understands the importance of ERP reporting, but what if you’re relying on the wrong reports?

Having access to ERP data in a usable format allows for a common understanding and the ability to take action based on what the data is telling you. What do you do if the way your data is presented is not useful, or flat out wrong?

How can your reports be wrong? That would mean that the data is wrong, wouldn’t it?
Not necessarily. Reports are wrong because they are stagnant. They represent the truth ONLY at the moment they are run. If that data is shared with others within your organization, the information the report(s) is trying to convey has already changed. Decisions are then made on bad information.

LN & Baan Data Collection News – A BUSY 2nd Quarter for Crossroads RMC Data Collection!

Kathy Barthelt 0 24576 Article rating: 5.0

Crossroads RMC’s data collection implementation team was busy during the 2nd quarter of 2020 with 3 simultaneous go lives!
 

  1. FSB North America went live with Crossroads RMC's entire suite of warehouse management Data Collection applications for LN FP7
  2. Johnson Crushers International went live with Labor Reporting and Report Operations Complete for LN 10.6
  3. CTP/Tube Processing went live with Material Issue for LN FP6.
     

All installations included Crossroads RMC’s Analytics Dashboard which will be implemented to provide valuable insights into the data collection transactions performed in the warehouse and shop floor. 

Learn more about LN/Baan Data Collection - Web Collect (formerly RMC3) >
Learn more about Analytics Dashboard >

OTTO - On-Time Ordering: Q&A with an MIS Manager from a metal fabrication manufacturer

George Moroses 0 429 Article rating: 5.0

OTTO  A Q&A with an MIS Manager from a metal fabrication manufacturer:

1. How difficult was it to initially install OTTO?

"We loaded OTTO on our AS/400 on a Friday morning and demonstrated OTTO's capabilities with our own data that afternoon. That really impressed me from an IS perspective because it was so easy to load and run."

2. Would you install it on a test system or on the production system?

"We installed on the production system in order to use live data. OTTO resides outside of the ERP system and builds its own databases so it is not detrimental to any other system."

3. How difficult was it to implement OTTO, was there a negative impact on daily operations?

"Some reports were being used on the first day of the evaluation. There was only positive impact on our operation. For example, shortages in our final assembly area were eliminated within 30 days of the demonstration."

4. Comments?

"I was greatly surprised OTTO fit so well with our operation. OTTO has worked well in our company (we substantially increased on time shipments at the same time our business was seeing a 3 fold increase), but each company has to judge for themselves how well OTTO fits in with their organization."

Contact us to learn how OTTO can help your company!

Analytics Dashboard News: What is a CFOs Biggest Concern?

Crossroads RMC 0 388 Article rating: 5.0

If you ask CFOs about their biggest concerns, most of them will tell you that increasing cash flow is a high priority.

In order to succeed at this, you have to keep an eye on your accounts receivable. Many companies, however, do not have the means or data to find out where they currently stand.

What if you could have that information at your fingertips?

Learn more about Analytics Dashboard for Infor LN/Baan >

Learn more about Analytics Dashboard for Infor LX/BPCS/M3 >

Dashboard Displays Current Production Data and Increases Production by 10-20%

Crossroads RMC 0 25012 Article rating: 5.0

Did you know that you can improve the performance of your shop floor simply by displaying how your shop floor workers are doing? Studies show that a 10-20% increase in production can be achieved by simply displaying current production data to your workers via dashboards. 

Using the Crossroads RMC's Analytics Dashboard, you can display performance metrics in a grid, graph, chart, or any way that makes sense. Learn how

Learn more about Analytics Dashboard for Infor LN/Baan >

Learn more about Analytics Dashboard for Infor LX/BPCS/M3 >

RSS
12

Theme picker

Tips:  LX | BPCS | M3

Determining whether to use Master Production Schedule (MPS) planning or Material Requirements Planning (MRP) planning for items in Infor LX and BPCS involves understanding the nature of the items and their demand characteristics.

Master Scheduled Items typically encompass finished goods or service items. These items receive their requirements either from Independent demand, Dependent demand, or a combination of both...

Advanced Remittance Processing, ARP, provides an automated approach to your cash application process. ARP works together with Accounts Receivable to save valuable time and resources by automatically applying incoming payments to open receivables during daily batch processing. You can easily and efficiently resolve unapplied remittances online.

Advanced Remittance Processing (ARP) is an automatic cash application process that allows you to perform the following functions:

12345678910Last

Theme picker

Tips: LN | Baan

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In Infor LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

In LN, a supplier's reliability is no longer based only on correct deliveries. The vendor rating functionality of LN is based on various objective criteria and subjective criteria that can be used to calculate the vendor’s rating.

 

The set up procedure for analyzing suppliers has changed completely compared to Baan IV.  To execute the vendor rating process, users must update the vendor ratings in the Update Vendor Rating (tdpur8850m000) session.

If users update the vendor ratings, the following stages exist in the update vendor rating procedure:


1. Calculate actual weightings

2. Calculate ratings for objective criteria

3. Calculate ratings for subjective criteria

4. Update overall vendor rating

First128129130131133135136137Last

Theme picker

Categories