Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

DON'T MISS - 8 Ways to Modernize your IBM i product– Topic #1: Best practices for improving security

Thursday, February 15, 2024 - 10am EST | 9am CST

George Moroses 0 1391 Article rating: 5.0

From internal controls to data protection, elevate your company’s security standards by exploring best practices that enhance both data protection and segregation of duty issues. Risk Management, Audit, IT, and Finance Officers are all invited to hear strategies that are used by fellow IBM i (LX, XA, System21) customers for modernizing and strengthening their prior vulnerabilities. 

Hosted by Peg Tuttle from the IBM i podcast, “The Incredible i Show,” join us to hear insights from both Infor leadership and your industry peers on:

  • How version upgrades have tightened internal control loopholes.
  • Structural IBM i advancements designed to safeguard your organization.
  • IBM i ecosystem solutions that strengthen both data and access vulnerabilities.

Don’t miss this first fireside chat, Eight Ways to Modernize your IBM i product – Topic #1 of 8: Best practices for improving security.

Register today!

Join Crossroads RMC at inPOWER 2023

Frank Petrasio 0 3602 Article rating: 5.0

🌟 Unlock the Future of Infor LX at inPower 2023! 🌟

Are you ready to take your Infor LX experience to the next level?

Join us at the highly anticipated inPower 2023 conference, where innovation, expertise, and networking converge to shape the future of your enterprise.

📅 Event Dates: September 11-14 📍 Location: Ingleside Hotel, Pewaukee, WI

🔥 Top 10 Reasons to Attend:

Effective September 30, 2023, IBM® will end support of the IBM i operating system 7.3

AND Infor will no longer support LX and related products on IBM i 7.3 as of June 1, 2024

Crossroads RMC 0 3361 Article rating: 5.0

THE CLOCK is T I C K I N G ... 

MARK YOUR CALENDARS!
Effective September 30, 2023, IBM® will end support of the IBM i operating system 7.3  AND  in line with IBM’s support policy, Infor will no longer support LX and related products on IBM i 7.3 after May 31, 2024.

All Infor LX releases, patches, and related solutions will be...

Optimize with Infor Development Framework: IDF

Infor LX | BPCS | M3

George Moroses 0 4626 Article rating: 5.0

Why You Need IDF

The Infor Development Framework (IDF) not only helps you modernize the look and feel of your LX software but also the interactions of the IBM i software with other applications in your business.

“The IDF is a multi-user interface, single codebase architecture that’s metadata-driven (and) provides a lot of flexibility to adapt the software for their processes.” says Infor. This is the direction that Infor is going starting...

RSS
12345678910Last

Theme picker

Tips:  LX | BPCS | M3

Advanced Remittance Processing, ARP, provides an automated approach to your cash application process. ARP works together with Accounts Receivable to save valuable time and resources by automatically applying incoming payments to open receivables during daily batch processing. You can easily and efficiently resolve unapplied remittances online.

Advanced Remittance Processing (ARP) is an automatic cash application process that allows you to perform the following functions:

In the ever-evolving landscape of manufacturing, cyber threats have become a formidable challenge, with a notable spike in ransomware attacks catching many off guard. These sophisticated attacks deploy tactics that are often new and bewildering to manufacturers, pushing the boundaries of what we thought we knew about cybersecurity in the industry. Let's dive into how these advanced threats are reshaping our approach to digital defense in manufacturing.

https://www.industryweek.com/technology-and-iiot/cybersecurity/article/21284176/a-new-wave-of-cyber-attacks-five-actions-to-take-now

12345678910Last

Theme picker

Tips: LN | Baan

Baan/LN Tip of the Week: Plan Codes

In Baan IV, plan items exist within the context of a plan code. A plan code includes only items of the MPS Item item type. Planned orders are independent of a plan code. Users can compare plan codes by means of the Plan Code Performance Comparison (cprmp4504m000) session.

The scenario concept in Infor LN replaces the plan code concept in Baan IV.

In Infor LN, the basic data for plan items is the same for all scenarios. However, users maintain not only the master plan within a scenario, but the planned orders as well.

For example, for each scenario, Users can specify:

  • Special demand for an item.
  • The availability of resources (in the Scenario – Availabilities (cprpd4160m000) session).
  • The sourcing strategies and supply strategies.

Users can compare scenarios by means of the Performance Indicators (cprao2201s000) session.

The Infor LN database must be created with the appropriate size. For example, if at least 150 GB is required for a year, create the database with the required size from the beginning. Do not let the size increase to the required size and cause additional fragmentation in the database and the NTFS volume.  Set the autogrowth to a minimum of 10 percent or 1 GB (for each extent) to avoid fragmentation on file system level. Never use the default extent size of 1 MB.

First122123124125127129130131Last

Theme picker

Categories