• Visit Us on Facebook
  • Visit Us on Twitter
  • Link with Us on LinkedIn
800.762.2077
         
         
               
               
               
               
               
               
               
         
              already registered? sign in here         

BPCS/LX Tip of the Week: Multi-level Shop Order Release Due Dates

Previously, Material Requirements Planning (MRP) preferred practices meant that the component’s due date was the same as the parent’s shop order release date. Because MRP trends have changed, the preference for this due date is the day before the release date of the parent. Although Infor LX already has this functionality in Shop Order Maintenance programs (SFC500), users could not change how due dates were determined for lower level shop orders in Multi-Level Shop Order Release, SFC530D.

This enhancement provides an additional parameter for Multi-Level Shop Order Release. This parameter allows the user to change how the due date of the child components is determined. The user is now able change how the due date is determined for multi-level shop orders. If the Due Date of Children parameter is set to 1=Yes, the due date of the child components is the same as the release date of the parent. If the parameter is set to 0=No, the due date is the day before the release date of the parent.

Optimize Your Manufacturing Today!

Wednesday, February 14, 2018/Author: Anthony Etzel/Number of views (89)/Comments (0)/ Article rating: No rating
Categories: BPCS & ERPLX Tips
Tags:

Baan/LN Tip of the Week: How is Your Productivity?

Are your employees not as productive as you’d like them to be? Are jobs not getting completed on schedule? 

Without actual data, making decisions about how efficient your operation is will be difficult. Start tracking actual time to complete each operation. Compare different production lines running the same job. Is one line running more efficiently? If so, start looking at why. Track downtime, setup, etc. Once you start really analyzing each piece of the puzzle, you can begin to uncover areas that are ripe for improvement.

Optimize Your Manufacturing Today!

Wednesday, February 14, 2018/Author: Kathy Barthelt/Number of views (40)/Comments (0)/ Article rating: No rating
Categories: Baan & ERP LN Tips
Tags:

Tip of the Week: Create a Repeatable Process

If you’ve been successful doing something in the past, you want to keep doing it that way. Are your procedures documented? Do you have workflows defined? Would creating video tutorials be helpful, especially for new employees? Giving employees the tools to be successful helps to ensure the success of the business as a whole.

Optimize Your Manufacturing Today!

Tuesday, February 06, 2018/Author: Kathy Barthelt/Number of views (97)/Comments (0)/ Article rating: No rating
Tags:

BPCS/LX Tip of the Week: 6 Powerful Steps to Win With Automation

  1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.     
  2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.
  3. Easy electronic scheduling by sequence and changing job priorities.
  4. Evaluate differences using actual times compared to standards.
  5. Improve data accuracy and eliminate the need to chase and fix errors.
  6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Optimize Your Manufacturing Today!

Tuesday, January 23, 2018/Author: Anthony Etzel/Number of views (167)/Comments (0)/ Article rating: No rating
Categories: BPCS & ERPLX Tips
Tags:

Baan/LN Tip of the Week: 6 Powerful Steps to Win With Automation

  1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.    
  2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.
  3. Easy electronic scheduling by sequence and changing job priorities.
  4. Evaluate differences using actual times compared to standards.
  5. Improve data accuracy and eliminate the need to chase and fix errors.
  6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Optimize Your Manufacturing Today!

Tuesday, January 23, 2018/Author: Kathy Barthelt/Number of views (170)/Comments (0)/ Article rating: No rating
Categories: Baan & ERP LN Tips
Tags:

Baan/LN Tip of the Week: Purchase Inquiry

In Baan IV Purchase Control, the purchase inquiry procedure enables user to:

  • Request a specific supplier to submit a quotation on the purchase inquiry for the delivery of an item.
  • Compare the prices and discounts of the quotations that are submitted by different suppliers.
  • Copy the inquiry data to a purchase order.

In LN, you can:

  • Request multiple business partners to submit a quotation on a specific request-for-quotation for the delivery of an item.
  • Compare the received quotations based on the following criteria:
    1. Price
    2. Quantity
    3. Vendor rating
    4. Delivery dates
    5. RFQ subjective criteria
  • Copy the quotation data to a purchase order, a purchase contract, or a price book.

Optimize Your Manufacturing Today!

Wednesday, January 17, 2018/Author: Kathy Barthelt/Number of views (137)/Comments (0)/ Article rating: No rating
Categories: Baan & ERP LN Tips
Tags:

BPCS/LX Tip of the Week: Using Pre-Assigned Lot Numbers

Some items in the manufacturing process may require a lot number. A quick and easy way to release the Shop Orders with lot numbers is by using the Multi-Level Shop Order Release.

Simply select the end item from the selection screen and use action 10 for the multi-level order release. At the bottom of the release screen is the field “Pre-Assign a Lot Number to Shop Orders”. Select 1 for the pre-assigned lot number assignment option.

This option will use the pre-assigned lot number on the shop order, if the lot number exists. If the lot number does not exist, the system will automatically create a lot number and assign it to the shop order for all items that are lot-controlled.

Optimize Your Manufacturing Today!

Wednesday, January 17, 2018/Author: Anthony Etzel/Number of views (129)/Comments (0)/ Article rating: No rating
Categories: BPCS & ERPLX Tips
Tags:
RSS